Customization: | Available |
---|---|
Usage: | Knitting, Weaving, Hand Knitting, Sewing, Embroidery, Fishing |
Feature: | High Strength, High Temperature-Resistant, Abrasion Resistant, Anti-Bacterial, Anti-UV |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product | Brand | Spec | Property | Application |
PPTA Filament |
YHTF100 | 440dtex267f | High strength, Highmodulus; excellenroperties in heatresistance, abrasionresistance, electrcalinsulation andchemical resistance. | Military equipments, opticcable, cordages, frictionelements of automobilebraking system, sealingpacking and heat insulation materials. |
830dtex/500f | ||||
1110dtex/500f | ||||
1680dtex/666f | ||||
2200dtex/666fx2 | ||||
PPTAStaple | YHTF300 | 38mm/1.68~2.52dtex | Flame retardance,heat resistance, heatresistance andexcellent spinningproperty. | Reinforced concrete, heat andabrasion resistant felts, flameretardant fabric, anti-cut &heat resistant spinning glovesfriction materials, flameretardant bedding. |
51mm/1.68~2.52dtex | ||||
60mm/1.68~2.52dtex | ||||
PPTA Super-shortstaple |
YHTF400 | 3mm/бmm | Light weight, highstrength and excellentinsulating property. | The aramid paper and aramidperforated plat are widelyapplied on trains andaerolines. |
YHTF410 | бmm | |||
PPTAPulp | YHTF500 | 0.8mm/2mm/3mm | Light weight, highstrength, heatresistance and finediscreteness. | Friction plate, aramid paper,reinforced materials. |
YHTF510 | 0.8mm/2mm |
Q: How long is the lead time? A: Sample lead time:3-7 days
Bulk lead time:7-10 days (depends on order quantity)
Q: How do I pay for my order?
A: We accept L/C, T/T, Western Union, Paypal, etc.
Q: What's the quality assurance we provided and how do we control quality?
A: (1) Established a procedure to check products at all stages of the manufacturing process - raw materials, in process materials, validated or tested materials, finished goods, etc. Besides, we have also developed a procedure which identifies the inspection and test status of all items at all stages of the manufacturing process.
(2) 100% inspection in assembly lines. All controls, inspections, equipment, fixtures, total production resources and skills are inspected to ensure they consistently achieve the required quality levels.
Q: How can you deal with quality issues that customer feedback after receiving the goods?
A:(1) Customers take photos of unqualified goods and then our sales staff will send them to Engineering Department to verify
(2) lf the issue is confirmed, our sales staff will explain the root cause and take corrective actions in coming orders.
(3) Finally, we will negotiate with our customers to make some compensation.